Our Solution
Dowdens Pumping & Water Treatment fabricate and fit out a range of standardised pressure reducing valve stations, but this station required a higher pressure rating not available with our standard off the shelf systems that are available in 16 / 25 bar (35/40 bar rated systems are built to order). Dowdens have manufactured these products for many years to help our resource industry customers arrest any water pressure spikes and/or surges in pipe systems and to aid these mines operating within and remaining fully compliant with Queensland Government Mine Site Compliance legislation, standards & guidelines.
This new Dual Pressure Control Station has been built to optimise plant reaction speeds, allow for greater operating ranges from between 2 – 35 bar and is manufactured with high-quality, reliable and readily available components. The design needs for the new Dual Pressure Control Station were borne primarily from Dowdens detailed underground observations of hydraulic occurrences within the mines existing water network. Working closely with the mines water infrastructure operators Dowdens were able to engineer, manufacture and deliver a product that increased the reliability of their mine water supply systems and assist with premeditated preventative maintenance routines.
All design, fabrication, installation and commissioning of the 35 bar Pressure Reducing Valve Station was undertaken by Dowdens Mackay’s in-house Engineering, Fabrication & Workshop Departments. With a history of successful installations over the past 20 years throughout the Queensland Mining Sector Dowdens Pumping & Water Treatment have the ability to expertly design/manufacture / install and commission specialised pumping and water treatment solutions that are built primarily in-house & onsite to our client’s specific unique requirements.
Dowdens dedicated departments of industry trained engineers, draftsmen, project managers, sales staff and tradespeople including fitters, mechanics, poly welders, machinists, plumbers, electricians and boilermakers enable us to offer an unmatched range of world-class engineering solutions for any type of fluid handling project. We truly are Queensland’s premier one-stop-shop for pumping and water treatment systems.
This projects entire design, manufacture, installation & commissioning process was completed on budget and within a tight timeline of 4 weeks set by the customer.
Key Components
- BERMAD WW720 PN35 Heavy Body Control & Relief Valves
- Hardy Spicer Hydraulic Hoses & Fittings
- Custom in-house design & drafting by Dowdens Mackay Projects Engineering team
- Custom in-house fabrication of all steel pipework